top of page

HyD Contract No. 09/HY/2013

All Videos

All Videos

Watch Now

Project Name:

HyD Contract No. 09/HY/2013

Highways Department Term Contract (Management and

Maintenance of Roads in Kowloon West excluding High Speed Roads 2014-2020)

 

Client Name:

Highways Departments

 

Project Description:

Traffic Impact Assessment Study and Traffic Diversion Proposal on Dismantling of a Damaged Sign Gantry near the Kowloon Entrance of the Cross Harbour Tunnel

The main features of the Traffic Diversion Proposal:

  • Full closure of a section of Hong Chong Road

  • Affected vehicles on Hong Chong Road were diverted to the platform of Hung Hom Station and Tsim Sha Tsui East before entering the Kowloon entrance of the CHT

  • the southbound traffic lanes of Salisbury Road between Hong Chong Road and Science Museum Road were temporarily converted into northbound traffic lanes

Hong Kong Polytechnic University Footbridge Linking Phase 8 Development and the Main Campus

Untitled.png

Project Name:

The Hong Kong Polytechnic University

Footbridge Linking Phase 8 Development and the Main Campus

 

Client:

The Hong Kong Polytechnic University

 

Project Description:

Traffic Impact Assessment services for Design & Build Contract for Footbridge Linking Phase 8 Development for Hong Kong Polytechnic University Chatham Road South outside the Hong Kong Polytechnic University eastbound and westbound will be full closure respectively; numerous traffic diversion will be adopted.

bottom of page